Nipomo CSD Frontage Road Trunk Sewer Replacement Project

The project work involves construction of approximately 210 feet of 8-inch PVC sewer pipe, 3,030 feet of 15-inch PVC sewer pipe, 365 feet of 16-inch HDPE sewer pipe, and 1,143 feet of 18-inch PVC sewer pipe. Approximately 365 feet of pipe will be installed using pilot tube guided auger bore methods. Option for installation of pipe using pipe bursting methods is provided and indicating on the drawings. The work will also include reconnection of ten sewer laterals and installation of nineteen new polymer manholes.