Nipomo CSD - 2024 Water Distributions System Improvements
The work includes but is not limited to furnishing all labor, materials, equipment, services, and performing all work necessary and incidental to the construction of new water distribution mains which includes: approximately 900 linear feet of new 4-inch, 425 linear feet of 8-inch, and 4,600 linear feet of 12-inch C900 DR 18 water distribution mains in open trench, blowoff assemblies, air and vacuum release assemblies, and a double detector backflow assembly.
Project Drawings-Combined PDF
(click to expand/collapse)
Name | Size | ||
Volume II - Plans_2024-10-15 | 9.7 MB |
Project Drawings - Separate PDFs
(click to expand/collapse)
Name | Size | ||
001 - Sheet 1 of 17 | 853.2 KB | ||
002 - Sheet 2 of 17 | 516.0 KB | ||
003 - Sheet 3 of 17 | 395.8 KB | ||
004 - Sheet 4 of 17 | 400.6 KB | ||
005 - Sheet 5 of 17 | 385.5 KB | ||
006 - Sheet 6 of 17 | 416.4 KB | ||
007 - Sheet 7 of 17 | 416.9 KB | ||
008 - Sheet 8 of 17 | 477.4 KB | ||
009 - Sheet 9 of 17 | 457.6 KB | ||
010 - Sheet 10 of 17 | 418.7 KB | ||
011 - Sheet 11 of 17 | 451.9 KB | ||
012 - Sheet 12 of 17 | 466.9 KB | ||
013 - Sheet 13 of 17 | 435.5 KB | ||
014 - Sheet 14 of 17 | 501.9 KB | ||
015 - Sheet 15 of 17 | 889.3 KB | ||
016 - Sheet 16 of 17 | 518.2 KB | ||
017 - Sheet 17 of 17 | 1.3 MB |