Prequalification Package for Frontage Road Trunk Sewer Replacement Project
The work involves construction of approximately 4,900 linear feet (LF) of sewer replacement, including 4,400 LF (+/-) of 8-inch to 18-inch (primarily 15-inch) diameter PVC sewer pipe, installed by open trench construction with the option of installation of HDPE via pipe bursting, and replacement through an intersection which requires jack-and-bore installation of approximately 375 LF with a 16-inch diameter HDPE carrier pipe inside a 28-inch diameter steel casing. The work will also include installation of 11 sewer lateral connections and 18 new polymer manholes.