Drought Relief and Resilience Project – Well Equipping and Pipeline Package

The Project consists of equipping a production well, constructing a new booster pump station, installing electrical conduit, and installing a conveyance pipeline from the well to the existing water system infrastructure, as described and implied in the Contract Documents. The work generally includes: mobilization; site preparation; trenching; furnishing materials for project; site wiring and controls installation, submittal and document preparation; compliance with regulatory requirements; surveying; temporary facilities; site maintenance, safety and security; testing; demobilization; and all labor, equipment, and incidentals required, to construct a ready for operation equipped well, booster station, and conveyance pipeline.
Project Drawings-Combined PDF (click to expand/collapse)
Project Drawings - Separate PDFs (click to expand/collapse)
Name Size
001- T-1 1.0 MB
002- G-1 382.4 KB
003- G-2 462.0 KB
004- G-3 946.1 KB
005- C-1 384.5 KB
006- C-2 361.7 KB
007- C-3 372.4 KB
008- C-4 376.5 KB
009- C-5 365.6 KB
010- C-6 338.4 KB
011- C-7 375.5 KB
012- C-8 3.5 MB
013- M-1 380.0 KB
014- M-2 435.8 KB
015- M-3 424.8 KB
016- M-4 359.9 KB
017- S-1 234.1 KB
018- S-2 134.1 KB
019- S-3 197.3 KB
020- S-4 160.7 KB
021- GE-1 341.0 KB
022- GE-2 279.8 KB
023- GE-3 425.2 KB
024- GE-4 400.4 KB
025- E-1 241.8 KB
026- E-2 899.6 KB
027- E-3 395.9 KB
028- E-4 365.3 KB
029- E-5 225.3 KB
030- E-6 276.7 KB
031- E-7 411.7 KB
032- E-8 223.1 KB
033- E-9 318.2 KB