Drought Relief and Resilience Project – Well Equipping and Pipeline Package

The Project consists of equipping a production well, constructing a new booster pump station, installing electrical conduit, and installing a conveyance pipeline from the well to the existing water system infrastructure, as described and implied in the Contract Documents. The work generally includes: mobilization; site preparation; trenching; furnishing materials for project; site wiring and controls installation, submittal and document preparation; compliance with regulatory requirements; surveying; temporary facilities; site maintenance, safety and security; testing; demobilization; and all labor, equipment, and incidentals required, to construct a ready for operation equipped well, booster station, and conveyance pipeline.

Status

Bidding Closed

Prebid Date8/7/24 10:00am

Bid Date9/5/24 11:00am

Company

Baron Canyon Mutual Water Company

Location

San Luis Obispo, CA

A non-mandatory pre-bid meeting will be held on August 7, 2024 between 10:00 am and 12:00 pm local time. The pre-bid meeting will be held at the Project site. Interested bidders must inform Kendall Houghton via email or phone that Bidder will be in attendance no later than 12:00 pm local time on August 5, 2024. Details regarding site access will be provided upon confirmation of planned attendance. Attendance at a pre-bid meeting is non-mandatory.