Prequalification Package for Frontage Road Trunk Sewer Replacement Project
The work involves construction of approximately 4,900 linear feet (LF) of sewer replacement, including 4,400 LF (+/-) of 8-inch to 18-inch (primarily 15-inch) diameter PVC sewer pipe, installed by open trench construction with the option of installation of HDPE via pipe bursting, and replacement through an intersection which requires jack-and-bore installation of approximately 375 LF with a 16-inch diameter HDPE carrier pipe inside a 28-inch diameter steel casing. The work will also include installation of 11 sewer lateral connections and 18 new polymer manholes.
Status
Bidding Closed
Bid Date | 11/14/24 2:00pm |
Company
Nipomo Community Services District
Location
Nipomo, CA
Inquiries regarding this prequalification process shall be provided in writing and directed to the District's Project Manager, Eileen Shields, at eshields@mknassociates.us. All inquiries or requests for modification or clarification in the Prequalification Application must be received no later than 4:00 PM PST on October 31,2024. Responses to all inquiries will be posted by November 8, 2024